IPP’s three founding principals have held key roles in the delivery of many long distance pipeline projects in Western Canada, samples of which are listed as follows:

Corridor Pipeline Expansion

463 km of NPS 42 pipeline for blended bitumen in northeast Alberta.  The scope of work was complete EPCM services, including detailed engineering design, procurement, construction contract documentation, construction inspection, construction management, and engineering support during construction. The Project included winter and summer construction through a range of muskeg swamp, rolling bushland, and developed farmland.

Polaris and Cold Lake Pipeline Systems

These two multi-phase programs involved more than 900 km of new pipelines up to NPS 42, for diluent and blended bitumen.  The scope of services included routing studies and field routing, FEED and detailed design, procurement, construction contract document preparation, and engineering support during construction.

Trans Mountain Anchor Loop

160 km of NPS 30 and 36 pipeline through the Rocky Mountains of Alberta and British Columbia, through Jasper National Park and Mount Robson Provincial Park.  The scope of services included routing studies, field routing, regulatory support and community discussions support, expert witness before the National Energy Board, detailed design, construction contract document preparation, and engineering support during construction. The pipeline was designed for installation beside and under Highway 16, and beside the CP Rail mainline to minimize impact to the National and Provincial Parks.

Nipisi Pipeline

100 km of NPS 24, 90 km of NPS 20, and 145 km of NPS 8 diluent and diluted blend oil pipelines located in northwest Alberta.  The scope of work included routing studies, detailed design, construction contract documentation, and engineering support during construction.

Boreal Pipeline Project

400 km of NPS 12 High Vapour Pressure and Natural Gas Liquids pipeline between Fort McMurray and Edmonton, Alberta.  The scope of services included routing, detailed engineering, preparation of construction contract documents, and engineering support during construction.

Southern Crossing Pipeline

303 km of NPS 24 high pressure gas pipeline across three mountain ranges from Yahk to Oliver in the southern interior of British Columbia.  The scope of work was full EPCM services, including routing, detailed design, procurement, construction management, and inspection.